The City of Winnipeg does not assume or accept any liability for loss or damages to any person or property arising from the use of or reliance on the information contained in this map. Cyclists assume full responsibility for and are expected to exercise caution to ensure their own safety. Cyclists should be aware that route conditions may vary depending on a variety of factors, including the time of day, day of the week, weather conditions, construction and/or season.Ĭyclists bear full responsibility for evaluating route conditions and planning routes appropriate to their personal riding skills. As with bike lanes, designation of bike routes should indicate to bicyclists that there are particular advantages to using these routes as. The City of Winnipeg does not warrant or make any representations as to the condition or availability of the routes contained in this map. Bike routes are shared facilities which serve either to: (a) Provide continuity to other bicycle facilities (usually Class II bikeways) or (b) Designate preferred routes through high demand corridors. This map is provided for information purposes only. This map outlines both existing and potential cycling routes based on The City of Winnipeg's Pedestrian and Cycling Strategies existing and proposed network as well as on local knowledge and experience for informal route suggestions. The Royal Borough of Greenwich provides a Thames Path map showing the cycling route for most of the length of the River Thames through. For information on regulations see the Manitoba Highway Traffic Act.